← all WIP
WORK IN PROGRESS · stage-2 mockup

Serangan Hyperlocal Dashboard

Stage-2 mockup of the matryoshka hyperlocal dashboard for
Banjar Serangan, Bali — the first instantiation of the five
architectural decisions locked on 4 May 2026 (matryoshka schema,
three trust rings, hyperlocal GIS as editable substrate, FCI
matryoshka with dual aggregation, federated-AI status visible).

Built in Indonesian (lang="id"), uses Leaflet for real basemap
+ heatmap overlays, ring-toggle UI for the resident / council /
hub-ops trust rings. Single-file HTML, ~93KB. Data is mocked at
this stage — the surface tests visual + IA + interaction patterns
before partner-data integration.

Open in new tab →Source on GitHub
LIVE EMBEDhttps://planetai.fab.city/local-hubs/serangan/

If the embed is blank, the preview has not yet been deployed to https://planetai.fab.city/local-hubs/serangan/. Flag it →

Opened
2026-05-05
Last updated
2026-05-05
Lead
Tomas Diez
Pilot anchor
Bali
Partners
CAST Foundation (coordinator review)
MDG / Fab Lab Bali (executor review)
IT Del — Bali office (Ben Koo, technical review)
Related track
track-bali-hyperlocal-dashboard

Looking for feedback on

  • Trust-ring toggle UX — does the resident / council / hub-ops gradient feel right, and does the gradual disclosure pattern hold?
  • Tier label localization — the universal T0–T4 schema underneath; does the Banjar Serangan label set on top read naturally to a Balinese reader?
  • FCI vertical strip — placement, density, whether the synthetic-vs-aggregated divergence is legible at a glance
  • Sensor + open-data integration cadence — what frequency do partners actually need; what is the right Bali Satu Data harvest rhythm
  • Indonesian localisation — translation accuracy, terminology choices, anything that reads as a literal translation rather than native phrasing

Not ready for

  • Production deployment (data is mocked)
  • Real-time data integration with Bali Satu Data
  • Customary-authority sign-off on the Tri Hita Karana cosmological-category mapping (Path B precondition still pending; see related decision)
  • Partner-name attribution beyond the three named technical leads

This is the first preview entry on the WIP surface. The format
doubles as a template — copy the YAML schema for any new
in-progress prototype across PLANETAI (Boston FAB26 demo,
Barcelona observatory v2, etc.). The preview detail page surfaces
the *Looking for feedback on* / *Not ready for* split deliberately,
because partners need to know what kind of comment is useful at
this stage and what is premature.

The Stage-2 mockup tag is precise: the IA decisions (Stage 1) are
locked; visual mockup is functional; data integration (Stage 3)
is the next sprint. Feedback now is most useful at the IA + visual
+ interaction layers, not at the data-pipeline layer.

File feedback on this previewOpen preview in new tab →

Related decisions